The RFI Wire

HomeThe RFP Wire › RFI-001740

Bid Result

MASPETH TOWN HALL : HVAC UPGRADE

AgencyNYC DDC
Solicitation8502026PW0004C
TradeHVAC
Bids openedAugust 31, 2026
Bidders4
Apparent lowENL MECHANICAL INCORPORATED — $2,287,000
Engineer's estimate$2,588,768
Spread0.2% (second-low vs. low)
First listedSeptember 1, 2026
RecordRFI-001740

Apparent low bidder: ENL MECHANICAL INCORPORATED at $2,287,000.00 — preliminary per DDC, subject to verification and not yet a confirmed award. 4 bids received. DDC engineer's estimate: $2,588,768.03.

BidderBid
ENL MECHANICAL INCORPORATED$2,287,000
ACS SYSTEM ASSOCIATES, INC$2,290,864
CDE AIR CONDITIONING CO.$2,478,134
NEELAM CONSTRUCTION CORP.$3,782,350

Results as read at the public bid opening; subject to review and award. The apparent low bidder is not the awardee until the owner makes an award.

NYC DDC construction contracts (preliminary bid results & awards) → The live bid board

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · Get The Punch List
© The RFI Wire · A Managed Construction Publication