The RFI Wire

HomeThe RFP Wire › RFI-000881

Bid Result

Sunset Lodge Abatement and Stabilization at Bayswater Point State Park

Bids openedNovember 20, 2025
Bidders3
Apparent lowSanz Construction Inc. — $540,000
Spread9.6% (second-low vs. low)
RecordRFI-000881

Apparent low bidder: Sanz Construction Inc. at $540,000 - from bid-opening records, subject to verification and not yet a confirmed award. 3 bids received.

BidderBid
Sanz Construction Inc.$540,000
HF Construction Enterprises$592,000
Spencer Contracting LLC$752,900

Results as read at the public bid opening; subject to review and award. The apparent low bidder is not the awardee until the owner makes an award.

The live bid board

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · Get The Punch List
© The RFI Wire · A Managed Construction Publication